其他业绩清单

国内完成项目一览:

序号

桥名

跨径(m)

桥型

应用年份

1

湖南长沙河西交通枢纽市政配套工程

54

简支梁桥

2015

2

湖南株洲枫溪大桥

300

自锚式悬索桥

2016

3

杭瑞高速岳阳洞庭湖大桥

1480+453.6

钢桁梁悬索桥

2017

4

湖南长沙桐关大桥

50+50

连续梁桥

2017

5

湖南湘潭昭华大桥

168+228

自锚式悬索桥

2018

6

贵州歆民路项目

32+56+32

梁桥

2016

7

吉林大安高架

31.2

梁桥

2018

8

山东北园高架桥

30+47+30

梁桥

2018

9

长沙红枫路桥

30+70+30

梁桥

2018

 

国外完成项目一览:

Nos.

PROJECT TITLE (YEAR)

CLIENT

STRUCTURES / PRODUCTS

Status

 

Year 2010

 

 

 

1

Menggantikan Jambatan Gantung ke Jambatan Konkrit di kg. Linsum, Rantau, Daerah Seremban, Negeri Sembilan. (2010)

JKR Seremban, Negeri

Sembilan

A single lane and single span 50m long motorway bridge / U-BEAM BRIDGE (1 piece of UBG1750-50M)

Completed

2

Kerja-Kerja Melebarkan Jln dari Seksyen 3.5 ke 4.1, Jln Kota Bahru, Gopeng (A118), Daerah Kinta, Perak D.R. (2010).

JKR Kinta, Perak

76m long by 2.5m long retaining wall /

L-SHAPED RETAINING WALL (38 pieces SRWS25/20-72 M)

Completed

3

Cadangan Menggantikan Kelubong  Sediada yang Merentangi Sg. Guntong di Jln Lahat, Ipoh, untuk Majlis Bandaraya Ipoh. (2010-2013)

Majlis

Bandaraya Ipoh

A 20m wide by single span 20m long motorway bridge / T-beam integral beam deck system (13 pieces TBG875 - 20 M)

Completed

 

Year 2011

 

 

 

4

Kerja-Kerja Membina Jambatan Baru di Kg. Ulu Geroh, Daerah Kampar, Perak D.R. (2011)

JKR Kinta, Perak

A single lane and single span 25m long motorway bridge/ T-BEAM BRIDGE & L-SHAPED RETAINING WALL (2 pieces of TBG1325-25M & 20 pieces of SRWS25/20 -40M)

Completed

5

Kerja-Kerja Membina Jambatan Baru di Kg. Ulu Kampar, Daerah Kampar, Perak D.R. (2011)

JKR Kinta, Perak

A single lane and single span 18m long motorway bridge/ T-BEAM BRIDGE & L-SHAPED RETAINING WALL (2 pieces of TBG1325-18 M & 12 pieces of SRWS25/20-24M)

Completed

6

Supply of SRW25/20 L-Shaped Retaining Walls to Westports, Port Klang, Selangor. (2011)

Chee Leong Construction & Engineering S/B

L-SHAPED RETAINING WALL (6 pieces of SRWS25/20 - 12M)

Completed

 

Year 2012

 

 

 

7

Construction and Completion of 2nd 300m of CT6 Wharf and 600m of CT7 Wharf and access bridges, CT6 Yard Zones R&S and Associated Works at Westports, Pulau Indah, Port Klang, Selangor. (2012).

Westport Malaysia / Putra Perdana Construction S/B

Multiple spans excess bridge of oversize cargo for the construction of Westport wharf / T-BEAM BRIDGE (102 pieces of TBG1000 - 12.1 M)

Completed

8

Membina Jambatan Konkrit Menghubungi Kg. Beng - Kg. Batu Reng, Lenggong, Daerah Hulu Perak, Perak D.R. (2012).

JKR Hulu Perak,  Perak

A single lane and single span 12m long motorway bridge/ T-BEAM BRIDGE & L-SHAPED RETAINING WALL

(2 pieces of TBG1325 - 12 M & 12 pieces of SRWS25/20-24M)

Completed

9

Kerja-Kerja Membina Jejantas Pejalan Kaki Menyeberangi Sekolah Raja Perempuan Taayah, Ipoh, Jalan Raja Dihilir, Daerah Kinta, Perak D.R. (2012).

JKR Kinta, Perak

40m single span pedestrian bridge /

PMBS (2 pieces of TBG1325 - 40 M)

Completed

10

Membina Jambatan Konkrit untuk Menggantikan Jambatan Bailey dan Kerja-Kerja Berkaitan di Kg. Ulu Kinta, Daerah Kinta, Perak D.R. (2012).

JKR Kinta, Perak

A single lane and single span 32m long motorway bridge/ T-BEAM BRIDGE (2 pieces of TBG1325 - 32 M)

Completed

11

Membina Jambatan Konkrit untuk Menggantikan Jambatan Bailey dan Kerja Kerja Berkaitan do Kg. Baru, Ulu Chemor, Daerah Kinta, Perak D.R. (2012)

JKR Kinta, Perak

 

A single lane and single span 30m long motorway bridge/ T-BEAM BRIDGE (2 pieces of TBG1325 - 29.5 M)

Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Year 2013

 

 

 

12

Projek Menggantikan Jambatan No.N32/08/00 Jln Kuala Klawang-Pekan Titi (N32), Jelebu, Negeri Sembilan. (2013)

JKR Jelebu, Negeri

Sembilan

A dual carriageway and single span 50m long motorway bridge/ U-BEAM BRIDGE (3 pieces of UBG1750 - 50 M)

Completed

13

Naiktaraf Jalan dan Jambatan di Sg. Nerok, Kota Tampan Air (Muaran), Jln Lenggong / Gerik, Daerah Hulu Perak, Perak D.R. (2013).

JKR Hulu Perak, Perak

A dual carriage way road bridge, three span by 15m wide / T-BEAM BRIDGE & L-SHAPED RETAINING WALL (30 pieces of TBG1325-29.5 M & 32 pieces of SRWS25/20 - 72 M)

Completed

14

Projek Menggantikan Jambatan NO.N6/006/70, Jalan Rantau-Siliau (N6), Seremban, Negeri Sembilan. (2013).

JKR Seremban, Negeri

Sembilan

A four carriageway and single span 51m long motorway bridge/ U-BEAM BRIDGE ( 5 pieces of UBG1750 - 51 M)

Completed

15

Membina Jejantas Pejalan Kaki dan Motosikal Dari Pekan Kuala Sepetang Ke Kg. Seberang Di Kuala Sepetang Daerah Larut, Matang Dan Selama, Perak D.R (2013)

JKR Larut, Matang & Selama, Perak

5 spans by 3.5m wide pedestrian crossing/ CUSTOMISED U-TROUGH BEAM (5 pieces - 21m)

Completed

16

Membaikpulih Jambatan Kampung Bermin, Jalan Pahang, Tapah, Daerah Batang Padang, Perak D.R. (2013)

JKR Padang Batang, Perak

A single lane and single span 42m long motorway bridge/ U-BEAM BRIDGE (1 piece of UBG1750 - 42 M)

Completed

17

Membina Jambatan Kampung Malau, Daerah Huu Perak, perak D.R. (2013).

JKR Hulu Perak, Perak

A single lane and single span 30m long motorway bridge/ T-BEAM BRIDGE (2 pieces of TBG1325-30 M and 12 pieces of SRWS25/20 - 24 M)

Completed

18

Cadangan Membina Jalan Kg. Banir Ke Laluan 1, Daerah Batang Padang, Perak. (2012-2015).

JKR Padang Batang, Perak

A dual carriage way road bridge, single span by 15m wide / T-BEAM BRIDGE (10 pieces of TBG1325-29 M)

Completed

19

Kerja Ukur Menaiktaraf Jambatan Merentasi Sg. Rantin, Mukim Kamunting, Daerah Larut & Matang, Perak D.R. (2013).

JKR Larut, Matang & Selama, Perak

A dual carriage way road bridge, single span by 22.5m wide / I-BEAM COMPOSITE BRIDGE (16 pieces of IB650-22 M)

Completed

20

Membina Jalan dan Jambatan di Kawasan Kampung Batu 6, Bandariang, Gerik, Daerah Hulu Perak, Perak D.R. (2013-2015)

JKR Hulu Perak, Perak

A single lane and single span 100m long motorway bridge/ U-BEAM BRIDGE (1 piece of UBG4000-100 M)

Completed

21

Cadangan  Menggantikan Jambatan Konkrit FT 071/2/698 Kampung Banjar, Di Laluan FT 071 Jalan Beruas - Ayer Tawar, Daerah Manjung, Perak D.R. (2013).

JKR Manjung, Perak

A dual carriage lanes and single span 12m long motorway bridge/ T-BEAM BRIDGE (8 pieces of TBG875-12 M)

Completed

22

Membaiki Jamabatan Di Kampung Chuar (Jalan Lama Pekan Kati), Daerah Kuala Kangsar, Perak D.R. (2013).

JKR Kuala Kangsar, Perak

A dual carriage lanes and single span 30m long motorway bridge/ T-BEAM BRIDGE (8 pieces of TBG1325-30 M)

Completed

 

Year 2014

 

 

 

23

Cadangan Menggantikan Pembentung Sediada, Melebarkan Jalan Dan Kerja-Kerja Di Laluan FT 058 Seksyen 3.50, Daerah Hilir Perak, Perak D.R. (2013)

JKR Hilir Perak, Perak

A dual carriage lanes and single span 8m long motorway bridge/ I-BEAM BRIDGE (22 pieces of UB650-8 M)

Completed

24

Kerja-Kerja Membina Dan Pencegah Banjir Sungai Ara Serta Kerja Kerja Lain Yang Berkaitan, Dearah Larut Matang Dan Selama, Perak Darul Ridzuan (Bridge 3 Sg. Ara CH 1250). (2014)

JPS Perak

A single lane and single span 50m long motorway bridge / U-BEAM BRIDGE (1 piece of UBG1750-50 M)

Completed

25

Kerja-Kerja Membina Dan Pencegah Banjir Sungai Kurau Dari Hulu kolam Bukit Merah Ke Pondok Tanjung Sepanjang 8.4 km Serta Kerja Kerja Lain Yang Berkaitan, Dearah Kerian, Perak Darul Ridzuan (Bridge 1 Sg. Kurau CH.3336.5). (2014)

JPS Perak

A single lane and single span 50m long motorway bridge / U-BEAM BRIDGE (1 piece of UBG1750-50 M)

Completed

26

Kerja-Kerja Membina Dan Pencegah Banjir Sungai Kurau Dari Pondok Tanjung Ke Hulu Sepanjang 4.88KM Serta Kerja Kerja Lain Yang Berkaitan, Dearah Larut Matang Dan Selama, Perak Darul Ridzuan (Bridge 2 - CH10080). (2014)

JPS Perak

A single lane and single span 50m long motorway bridge / U-BEAM BRIDGE (1 piece of UBG1750-50 M)

Completed

27

Membaikpulih dan Membina  Jambatan Baru di Kg. Desa Murni, Kuala Rompin, Daerah Rompin, Pahang. (2014).

JKR Kuala Rompin, Pahang

A single lane and single span 12m long motorway bridge / I-BEAM BRIDGE (4 pieces of UB650-12 M)

Completed

28

Membina Jambatan Dari Kg. Baharu Ke Kg. Teluk, Manjung Daerah Majung, Perak D.R. Bridge over Sg. Ayer Tawar From CH2424.5m to 2843.50m (2014-2017).

JKR Manjung, Perak

A dual carriage lanes and ten span 420m long motorway bridge/ U-BEAM BRIDGE (20 pieces of UBG2000-41.5 M)

Completed

29

Membina Baru Sebuah Jambatan Konkrit Dua Lorong Merentasi Sungai Kangsar Serta Kerja-Kerja Berkaitan Bagi project menaikataraf Jalan Masuk Ke Pusat Penyelidikan Mardi, Negeri Perak di Kuala Kangsar, Perak D.R. (2014).

Ministry of Agriculture

(MOA)

A dual carriage lanes and single span 32m long motorway bridge/ T-BEAM BRIDGE (5 pieces of TBG1325-31.5 M)

Completed

30

Cadangan Kerja-Kerja Merobohkan, Membina dan Menyiapkan Sebuah Jambatan di Wisma LKIM, Dearah Sepang, Selangor. Untuk Lembaga Kemajuan Ikan Malaysia. (2014)

Ministry of Agriculture

(MOA), Lembaga Kemajuan Ikan Malaysia (LKIM)

A four carriage lanes and single span 32m long motorway bridge/ T-BEAM BRIDGE (14 pieces of TBG1325-31.5 M)

Completed

31

Membina dan menyiapkan 'viaduct' dan lain-lain kerja yang berkaitan di seksyen 49, laluan 4 (KM 157 Gerik -Kota Bahru), Koridor Ekologi Central Forest Spine (CFS), Gerik, Perak Darul Ridzuan. (2014-2015).

JPS Malaysia

A three carriage lanes and five spans 200m long motorway bridge/ U-BEAM BRIDGE (20 pieces of UBG2000-39.5 M)

Completed

32

Menggantikan Jambatan Sg. Choh, Jalan Tambun / Tg. Rambutan, Laluan A13, Daerah Kinta, Perak Darul Ridzuan. (2014).

JKR Kinta, Perak

A four carriage lanes single span 32m long motorway bridge/ U-BEAM BRIDGE (4 pieces of UBG1750-32 M)

Completed

33

Menggantikan Jambatan Kayu Teluk Raja Bayang Di Pulau Pangkor, Laluan A205, Daerah Manjung, Perak Darul Ridzuan. (2014)

JKR Manjung, Perak

A dual carriage lanes single span 12m long motorway bridge/ I-BEAM BRIDGE (6 pieces of IB650-12 M)

Completed

34

Membina Jambatan Baru Kampung Merdeka Di Sungai Batang Padang, Daerah Hilir Perak, Perak Darul Ridzuan. (2014)

JKR Hilir Perak, Perak

A single carriage lane single span 59m long motorway bridge/ U-BEAM BRIDGE (1 pieces of UBG2000-57.5 M)

Completed

35

RTB Lembangan Sungai Kerian Projek Menaiktaraf Jambatan Alur Limpah Selatan Di Empangan Bukit Merah Serta Kerja Kerja Lain Yang Berkaitan Di Daerah Kerian Negeri Perak Darul Ridzuan. (2014).

JPS Malaysia

A dual carriage lanes six spans 56m long motorway bridge/ I-BEAM BRIDGE (36 pieces of IB650- 9.2 M)

Completed

36

Kerja -kerja Ukur Bagi Menaiktaraf Jalan Luar Bandar dalam Dun Tahan - Jalan Sungai Yap Ke Kampung Keluang, Kuala Tembeling, Daerah Jerantut, Pahang Darul Makmur. (2014)

JKR Jerantut, Pahang

A dual carriage lanes single span 50m long motorway bridge/ U-BEAM BRIDGE (2 pieces of UBG2000-49.5 M)

Completed

37

Membina Jambatan Penempatan Orang Asli, Pos Perwor, Sungai Siput, Perak D.R. (Bridge 1). (2014-2015).

JKR Malaysia

A dual carriage lanes and single span 31m long motorway bridge/ T-BEAM BRIDGE (7 pieces of TBG1325-29.5 M)

Completed

38

Membina Jambatan Penempatan Orang Asli, Pos Perwor, Sungai Siput, Perak D.R. (Bridge 3). (2014-2015).

JKR Malaysia

A dual carriage lanes and single span 31m long motorway bridge/ T-BEAM BRIDGE (7 pieces of TBG1325-29.5 M)

Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

39

Menaiktaraf Jalan Pos Sinderut, Dun Jelai, Parlimen Cameron Highland, Pahang Darul Makmur. (Total package come with 8 Bridges). (2014-2015).

Kementerian Kemajuan Luar Bandar and Wilayah (KKLW)

A total of 8 number of road bridges, come with dual carriage lanes and single span with various length of 12m, 16m, 21m and 25m long motorway bridge/ I-BEAM BRIDGE (14 pieces of IB650-12 M; 14 pieces of IB650-16 M; 7 pieces of IB1000- 21 M and 21 pieces of IB1000-25 M)

Completed

40

Menaiktaraf Jalan Dari Kok Lanas Ke Sek. Banggol Saman Ke Sek. Danang, Kereteh, Pasir Putih, Kelantan. Fasa 2. (Bridge 1, L = 25m) (2014)

Kementerian Kemajuan Luar Bandar and Wilayah (KKLW)

A dual carriage lanes single span 25m long motorway bridge/ U-BEAM BRIDGE (2 pieces of UBG1750-25 M)

Completed

41

Menaiktaraf Jalan Dari Kok Lanas Ke Sek. Banggol Saman Ke Sek. Danang, Kereteh, Pasir Putih, Kelantan. Fasa 2. (Bridge 2, L = 40m) (2014)

Kementerian Kemajuan Luar Bandar and Wilayah (KKLW)

A dual carriage lanes single span 25m long motorway bridge/ U-BEAM BRIDGE (2 pieces of UBG1750-40 M)

Completed

42

Memperelokkan Jalan Taiping/ Selama, Daerah Larut, Matang dan Selama, Perak D.R. (FASA 2A :  Kubu Gajah ke Penempatan Rancangan Belia Pondok Tanjung). (2014-2015)

JKR Perak

A dual carriage lanes single span 50m long motorway bridge/ U-BEAM BRIDGE (3 pieces of UBG2000-49.5 M)

Completed

43

Projek Cadangan Pembinaan Jeti Dan Jambatan Konkrit Baru Di Balembang Pulau Bum Bum, Semporna, Sabah. (2014-2015).

Kementerian Kemajuan Luar Bandar and Wilayah (KKLW)

240m long concrete jetty

Completed

44

Proposed Development of Theme Park On Plot E & F at Zon 6, Bandar Meru Raya, Mukim Kinta, Daerah, Ipoh, Perak D.R. (Bridge 1, Pedestrian bridge) (2014).

PKNP, Senderson Group

120m long pedestrian bridge (24 pieces of IB650-20m)

Completed

45

Proposed Development of Theme Park On Plot E & F at Zon 6, Bandar Meru Raya, Mukim Kinta, Daerah, Ipoh, Perak D.R. (Bridge 2, Service bridge) (2014).

PKNP, Senderson Group

16m long service bridge (7 pieces of IB650-16m)

Completed

46

Cadangan Membina Dan Menyiapkan Jalan Masuk Dari Kg. Kapitangan Ke Kg. Dogoton, Pulau Banggi, Daerah Kudat, Sabah (Bridge 3, L =24m). (2014)

Kementerian Kemajuan Luar Bandar and Wilayah (KKLW)

A single lane and single span 24m long motorway bridge/ T-BEAM BRIDGE

(3 pieces of TBG1325 - 24m)

Completed

47

Cadangan Membina Dan Menyiapkan Jalan Masuk Dari Kg. Kapitangan Ke Kg. Dogoton, Pulau Banggi, Daerah Kudat, Sabah (Bridge 4, L =30m). (2014)

Kementerian Kemajuan Luar Bandar and Wilayah (KKLW)

A single lane and single span 30m long motorway bridge/ T-BEAM BRIDGE

(3 pieces of TBG1325 - 30m)

Completed

48

Menggantikan Jambatan FT073/040/070 Di Atas Sungai Bukit Berapit, Perak D. R. (2014)

JKR Perak

A dual carriage lanes single span 16m long motorway bridge/ T-BEAM BRIDGE (9 pieces of TBG875-16m)

Completed

49

To Construct A New RC Bridge At The Mines Resort City, Jalan Dulang, Seri Kembangan, Selangor Darul Ehsan. (2014)

Mines Resort

22m long by 11.5m wide service bridge crossing canal (8 pieces of IB650-22m)

Completed

 

Year 2015

 

 

 

50

Menggantikan Jambatan Kayu Teluk Raja Bayang Di Pulau Pangkor, Laluan A205, Daerah Manjung, Perak Darul Ridzuan. (2015)

JKR Perak

6 pcs of DURA® IB650-12.2m & 24 pcs of Customised DURA® planks

Completed

51

Pembinaan Lencongan Sungai Baru (CH0 - CH12600) Dan Menaiktaraf Sungai Anak Bukit (CH 0 - CH 1750) Serta Kerja-Kerja Berkaitan, Racangan Tebatan Banjir Sungai Kedah/Anak Bukit, Kedah. (13 Light Traffic Bridge). (2015 – 2017)

JPS Malaysia

13 nos of 3 spans bridge come with 78 pcs of DURA® IB650-20m & 13 pcs of DURA® UBG1750-42m

On-going

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

52

Rancangan Tebatan Banjir Lembah Bertam Cameron Highlands, Pahang. Project Melebar Dan Mendalamkan Sungai Bertam Dan Kerja-Kerja Berkaitan. (Bridge MDCH1, 2 and 3). (2015)

JPS Malaysia

3 nos. of dual carriageway singles span bridge of 30m long, come with 9 pcs of DURA® UBG1250-30m

Completed

53

Rancangan Tebatan Banjir Lembah Bertam Cameron Highlands, Pahang. Project Melebar Dan Mendalamkan Sungai Bertam Dan Kerja-Kerja Berkaitan. (Bridge JK1 & JK2) (2015)

JPS Malaysia

2 nos. of single span bridge come with 2 pcs of DURA® UTG1500-30m

Completed

54

Membina semula Jambatan Parit Sadang Rancangan Saliran Pertanian Sadang, Mukim Belanja, Daerah Perak Tengah, Perak D.R (2015)

JPS Perak

1 single span bridge come with 4 pcs of DURA®   IB650-15m and 1 dual carriageway single span bridge come with 4 pcs of Dura® IB650-18m

Completed

 

 

 

55

Membaik Pulih semula struktur Jambatan I-Beam yang runtuh Sungai Sengkuang di Hangat Bota, Perak Tengah. (2015)

JPS Perak

1 dual carriageway single span bridge come with 3 pcs of DURA®   IB650-15m

Completed

 

Year 2016

 

 

 

56

Menaiktaraf Jalan sedia ada sepanjang 25.5km dari kampong Bawong Ke RPS Legap Sungai Siput, Kuala Kangsar, Perak (Bridge 1, 2 and 3) (2016)

KKLW

3 nos of bridges of dual carriageway come with 14 pcs DURA®   IB650-12m and 7 pcs DURA®   IB850-23m

Completed

 

57

Pembinaan Jambatan Konkrit bar uke tapak sekolah Tamil Serendah, Daerah Hulu Selangor, Selangor (2016)

JKR Selangor

1 single span motorway bridge come with 4 pcs DURA®   IB650-15m

Completed

58

Membina jejantas di depan Sekolah Kebangsaan Nan Hwa, Jalan Lin Chin Mei, Sitiawan, Perak (2016)

JKR Manjung

1 single span pedestrian bridge with DURA®   UBG1750-30m

Completed

59

Menggantikan Jambatan Menyeberangi Sungai Kinta, Jalan Batu Gajah – Gopeng, Kinta, Perak (2016)

JKR Perak

A dual carriage lanes and 3 spans 75m long motorway bridge come with 4 pcs DURA®   UBG1750 -45m, 11 pcs of IB650-18m and 11 pcs of IB650-12m

Completed

60

Menaiktaraf Jalan kampong sepanjang 19km di Pos Hendrop, Mukim Ulu Nenggiri, Gua Musang, Kelantan (2016)

JAKOA

A total of 7 nos of road bridges, come with dual carriage lanes and single span with 24 pcs DURA®   IB650-12m and 4 pcs DURA®   IB650-18m

Completed

61

Menaiktaraf Jalan Morak-Kebakat-Cabang Empat [4] Tok Mek Ngah, Tumpat, Kelantan [Fasa 2] (2016)

JKR Kelantan

A dual carriage lanes and 22.5m wide 1 span motorway bridge come with 7 pcs DURA®   UBG2000 -55m

Completed

62

Pembangunan semula Pasar Ayam dan Parkir bertingkat di Ipoh, Perak (2016)

DPI

A footbridge with 2.3m width crossing from Pasar Ayam to Building UTC come with 1 pcs DURA®   UTG1200 -17m

Completed

63

Menaiktaraf Fasiliti Empangan, Membina dan menyiapkan sebuah jambatan laluan ringan(LTB) merentasi spillway di Empangan anak Endau, Pahang (2016)

JPS Rompin

A single span pedestrian bridge with 2.2m width come with 1 pcs of DURA®   UBG1250 -35m

Completed

64

Membina semula Parit Besar Bakong, Rancangan saliran pertanian Changkat Cermin, Mukim Bota, Daerah Perak Tengah, Perak (2016)

JPS Perak

1 span middle traffic bridge of 6m width come with 2 pcs of DURA®   UBG1250 -35m

Completed

65

Menggntikan Jambatan di atas Sungai Kinta, Kampung Paloh, Mukim Ipoh, Daerah Kinta, Perak (2016)

JKR Perak

A dual carriage lanes single span 55m long high traffic bridge/ U-BEAM BRIDGE (10 pieces of UBG2000-50 M)

On-Going

66

Membina Jambatan Baru di Kampung Sawa, dan kerja kerja yang berkaitan, Daerah Hulu Perak, Perak (2016)

JKR Hulu Perak

3 spans motorway bridge of total 180m long and 5m width come with 1 pc DURA®   UBG1750-35m, 1 pc DURA®   UBG1750-55m, 2 pcs DURA®   UBG1750-45m

On-Going

 

Year 2017

 

 

 

67

Membina Dan Menyipakan Jalan Terengganu By-pass, Kuala Terengganu (ST – 1) (2017)

JKR Terengganu

A dual carriage lanes and 5 spans 35m long motorway bridge come with 20 pcs DURA®   UBG2000 -35m

On-Going

68

Membina Dan Menyipakan Jalan Terengganu By-pass, Kuala Terengganu (ST – 2) (2017)

JKR Terengganu

A dual carriage lanes and 1 spans 35m long motorway bridge come with 4 pcs DURA®   UBG2000 -35m

On-Going

69

Membina Dan Menyipakan Jalan Terengganu By-pass, Kuala Terengganu (ST – 3) (2017)

JKR Terengganu

A dual carriage lanes and 5 spans 38m long motorway bridge come with 20 pcs DURA®   UBG2000 -38m

On-Going

70

Membina Dan Menyipakan Jalan Terengganu By-pass, Kuala Terengganu (ST – 4) (2017)

JKR Terengganu

A dual carriage lanes and 5 spans 38m long motorway bridge come with 20 pcs DURA®   UBG2000 -38m

On-Going

80

Membina Jambatan Di Kampung Batu Papan Gua Musang, Kelantan

JKR Kesedar

 

1 span middle traffic bridge of 4m width come with 1 pcs of DURA®   UBG1750 -42m

Completed

81

Membina Jambatan Di kampung Rancangan Merah, Sungai Kenering, Lenggong, Hulu Perak

Jabatan Tanah Gerik, Perak

1 span light traffic bridge of 4m width come with 1 pcs of DURA®   UBG1750 -42m

Completed

82

Membina Jambatan Di Sungai Peh, Jalan Felda Bersia to Kg. Bongor, Daerah Hulu Perak, Gerik, Perak

Jabatan Tanah Gerik, Perak

1 span middle traffic bridge of 7m width come with 5 pcs of DURA®   IBeam 650 -20m

Completed

83

Cadangan Menaiktaraf Jalan Pasir Hor, Kubang Kerian ke Pasir Jelatang, Pasir Tumbuh, Kota Bharu, Kelantan (Sg. Seribong)

JKR Kelantan

3 spans of Highway Bridge of 12m width comes with 6 pcs of DURA®   UBG1750 -24m and 3 pcs DURA®   UBG1750 -50m

On-Going

84

Rancangan Tebatan Banjir Lembangan Sg. Muar, Johor. Pembinaan Pintasan Belemang Di Sg. Muar Dan Kerja Kerja Lain

JPS Malaysia

5 spans of Highway Bridge of 7.4m width comes with 8 pcs of DURA®   UBG2000 -39.5m and 2 pcs DURA®   UBG2000 -49.5m

On-Going

85

Cadangan Menggantikan Jambatan Sempit Di KM 1.9, 3.3, 4.9 dan 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang, Johor

JKR Johor

1 span Highway bridge of 13.5m width come with 18 pcs of DURA®   IBeam 650 - 18m

Completed

86

Menaiktaraf Jambatan Sediada Di Jalan Bukit Tambun Berdekatan Dengan Stadium Batu Kawan, Batu Kawan, Mukim 13, Seberang Perai Selatan, Pulau Pinang (Bridge 1)

PDC Penang

5 spans of Highway Bridge of 28.06m width comes with 16 pcs of DURA®   UBG1500 -37.25m and 24 pcs DURA®   UBG1500 -43.5m

On-Going

87

Menaiktaraf Jambatan Sediada Di Jalan Bukit Tambun Berdekatan Dengan Stadium Batu Kawan, Batu Kawan, Mukim 13, Seberang Perai Selatan, Pulau Pinang (Bridge 2)

PDC Penang

1 span Highway bridge of 40m width come with 27 pcs of DURA®   IBeam 850 - 22m

On-Going

88

Membina Jambatan Merentangi Sg. Perak di antara Kg. Seberang Manong ke Pekan Manong, Kuala Kangsar, Perak

JKR Malaysia

5 spans of Highway Bridge of 11.5m width comes with 9 pcs of DURA®   UBG3000 -70m and 6 pcs DURA®   UBG2000 -45m

On-Going